Why is per-room labor the whole game?
Ten minutes of pad trimming across 180 guestrooms is thirty hours of crew time, sitting on the critical path of a phased install, producing no design value at all.
How do you build the pad schedule?
Straight off the FF&E rug schedule: one pad size per room type, ordered at volume, staged to your install phasing so a floor is not storing pads for a phase six weeks out.
What about the rooms that are not identical?
There are always a few — corner suites, ADA rooms, the ones where a column landed differently than the drawing. The perforations absorb that without a separate order line.
Why does overnight work suit this?
Public-space installs happen between close and open. Nothing can run long, and nothing can leave debris in a corridor of occupied rooms.
Published 2024-08-13. Last updated 2026-08-01.